Skip to main content

Lamp Control using PLC Logic Condition

 Build the ladder logic program to turn ON and OFF the lamp using push buttons with respect to program logic conditions.

PLC Lamp Control


PLC Problem Logic

Start PB and Stop PB are used to turn ON and OFF the lamp.


It should follow the following two cases.


CASE 1 :

Start PB is used to turn ON the lamp, Same Start PB is thrown again to turn OFF the lamp.


CASE 2 :

Start PB is Pressed to turn on the Lamp, if stop PB is pressed to turn OFF the lamp, Start PB is pressed twice to turn ON the lamp again.

NOTE: Both the cases should satisfy in single program using minimum number of memories. Its user choice to pick the case option.

List of Inputs and Outputs

PLC Lamp Program

PLC Lamp Ladder Logic Description
RUNG 0000
Latching rung to operate the system through Master Start and Stop PB.

RUNG 0001
To store the status of start PB (When we released hand after we pressed it for first time) when lamp is in ON condition. Since we are using Push Buttons, Memory Switch B3:0/1 is connected in parallel.

RUNG 0002
To store the status of Start PB ON condition for second time to turn off the lamp (Refer CASE 1 in program logic).


 
Stop PB is connected in parallel as normally open PB to perform OFF condition of lamp.(Refer CASE 2 in program logic).

Since we are using Push Buttons, Memory Switch B3:0/2 is connected in parallel (Latching).

RUNG 0003
For CASE 2 condition, when lamp is turned off using stop PB, Start PB is pressed twice to turn on Lamp .Counter is used to count the ON condition of start PB.

Rung 0004
Main rung to connect the Previous rung condition in series and parallel to turn ON/OFF lamp according to program logic.

Note: Memory bits are used to store the status and get the sequence of operation.

Conclusion:
The above explained ladder logic for lamp turn ON/OFF is for example only. We can use this example program to understand the working of Push Buttons, memory bit and latching in AB PLC.
-END-


Comments

Popular posts from this blog

Ferrules and Cross Ferruling

 Ferrules are identification labels provided for every wire terminations in an instrument, equipment, or electrical/instrumentation control panels. These tube-shaped sleeves can be inserted easily on each individual wire in a multi-core cable. In earlier days fixed digits/letters are used as ferrules, but now Instrumentation engineers/technicians prints out desired ferrules by using a ferrule printing machine. Typical Ferrule The numbers/ letters on the ferrules will be given as per the approved electrical hook up or loop diagrams. This helps technicians to easily identify a particular loop/wiring from a series of terminal blocks and to troubleshoot the desired terminal connection. Separate numbers on the ferrules distinguish the positive and negative polarities of wires, thus ensure the polarity protection of the instrument. Cross Ferruling  As a wire is connected on its both ends, it is quite useful to use a cross reference method for wire identification. Unlike normal ferru...

What is a Torbar? – Averaging Pitot Tubes

 The Torbar is employed for flow measurement of liquids, gases, or steam in circular, square, or rectangular section ducts for large flow rates. The Torbar is an insertion type multi-port self-averaging primary sensor for flow measurement. Torbar TORBAR is a set of Pitot tubes mounted on a bar across the pipeline with no moving parts. An averaging Pitot tube is a technology, while TORBAR is a manufacturing brand name. There are several brands available in the market with VERABAR, ANNUBAR, etc. Averaging Pitot Tube Principle Purpose Averaging Pitot tube can be employed when the average velocity of the flow profile, rather than the velocity in a specific point in the cross-section is desired. Averaging Pitot Tubes Principle It measures the differential pressure between the static pressure tap and the tap of full pressure of a stream. Thus such magnitude of differential pressure is directly proportional to the square of the flow rate. Working The TORBAR is designed in such a way that ...

The Method and Process of Siemens PLC Hardware Configuration

 The hardware configuration of Siemens PLC can usually adopt the following methods and processes: Determine control tasks and system requirements: Before hardware configuration, it is necessary to clarify the tasks and requirements of the control system, including the requirements for input and output points, control accuracy, speed, and safety. Select the PLC model and module: According to the control task and requirements, select the appropriate PLC model and module, including CPU, I/O module, communication module, power supply module, etc. Assemble the cabinet and install the modules: According to the selected PLC model and module, assemble the cabinet and install the modules, pay attention to the installation sequence, cable wiring, wiring method, etc. Connect the input and output devices: connect the input and output devices with the input and output modules of the PLC, you need to pay attention to the correctness, stability and safety of the wiring. Perform software configura...