 Write a PLC program that when a start push button is pressed all the 3 motors are ON and after 3 seconds the first motor shutdowns automatically, then after 7 seconds the second motor shutdowns automatically, and after 12 seconds the last motor shutdowns automatically. At any time if the stop pushbutton is pressed all the three motors are shutdown.

Note the best practice to learn the PLC programming is to start writing the PLC program, take your time before you review the answer.

Inputs and Outputs 

I0.0: start push Button (Normally open contact)

I0.1: Stop Push Button (Normally Closed Contact)

Q0.0: Motor 01

Q0.1: Motor 02

Q0.2: Motor 03

T1: Timer 01

T2: Timer 02

T3: Timer 03

Shutdown Motors in Timed Operation

S_PEXT Instruction
S_PEXT (Extended Pulse S5 Timer) starts the specified timer if there is a positive edge at the start (S) input. A signal change is always necessary in order to enable a timer.
The timer runs for the preset time interval specified at input TV even if the signal state at the S input changes to “0” before the time interval has elapsed. The signal state at output Q is “1” as long as the timer is running.

The timer will be restarted (“re-triggered”) with the preset time value if the signal state at input S changes from “0” to “1” while the timer is running.

The timer is reset if the reset (R) input changes from “0” to “1” while the timer is running. The current time and the time base are set to zero.

PLC Program description
 Network 1:
When the start PB is pressed the “timer 01” is energized and starts to count 3 seconds and runs the “motor 01” for 3 seconds.
The PEXT is used because the start signal is a pulse as it is a push-button (PB).
When the stop PB is pressed at any time the timer 01 resets and shutdowns the motor 01.
Note: When we press the Start pushbutton for the first time, then all the motors will be turned ON and runs. In the next networks, I am discussing what will happens for the first time when we press the start push-button.

Network 2:
When the start PB has pressed the timer 02 is energized and starts to count 7 seconds and runs the “motor 02” for a 7seconds.
When the stop PB is pressed at any time the “timer 02” resets and shutdowns the motor 02.
Network 3:
When the start PB is pressed the timer 03 is energized and starts to count 12 seconds and runs the “motor 03” for a 12seconds time.
When the stop PB is pressed at any time the timer 03 resets and shutdowns the motor 03.
Note: For our simple example, we used motors shutdown time in seconds. In practical industrial applications, it will be in hours, minutes, and seconds depends on our requirements.

Comments

Popular posts from this blog

PLC Program for Mixing Tank

 Create a ladder diagram for controlling a batch mixing process. Implement a PLC program for mixing tank or Mixing Process using PLC Ladder Logic. PLC Program for Mixing Tank Fig : Mixing tank A tank is used to mix two liquids. The required control circuit operates as follows: A. When the START button is pressed, solenoids A and B energize. This permits the two liquids to begin filling the tank. B. When the tank is filled, the float switch trips. This de-energizes solenoids A and B and starts the motor used to mix the liquids together. C. The motor is permitted to run for 1 minute. After 1 minute has elapsed, the motor turns off and solenoid C energizes to drain the tank. D. When the tank is empty, the float switch de- energizes solenoid C. E. A STOP button can be used to stop the process at any point. F. If the motor becomes overloaded, the action of the entire circuit will stop. G. Once the circuit has been energized, it will continue to operate until it is manually stopped. Solution...

Ferrules and Cross Ferruling

 Ferrules are identification labels provided for every wire terminations in an instrument, equipment, or electrical/instrumentation control panels. These tube-shaped sleeves can be inserted easily on each individual wire in a multi-core cable. In earlier days fixed digits/letters are used as ferrules, but now Instrumentation engineers/technicians prints out desired ferrules by using a ferrule printing machine. Typical Ferrule The numbers/ letters on the ferrules will be given as per the approved electrical hook up or loop diagrams. This helps technicians to easily identify a particular loop/wiring from a series of terminal blocks and to troubleshoot the desired terminal connection. Separate numbers on the ferrules distinguish the positive and negative polarities of wires, thus ensure the polarity protection of the instrument. Cross Ferruling  As a wire is connected on its both ends, it is quite useful to use a cross reference method for wire identification. Unlike normal ferru...

What is Relay? How it Works? Types, Applications, Testing

 We use relays for a wide range of applications such as home automation, cars and bikes (automobiles), industrial applications, DIY Projects, test and measurement equipment, and many more. But what is Relay? How a Relay Works? What are the Applications of Relays? Let us explore more about relays in this guide. What is a Relay? A Relay is a simple electromechanical switch. While we use normal switches to close or open a circuit manually, a Relay is also a switch that connects or disconnects two circuits. But instead of a manual operation, a relay uses an electrical signal to control an electromagnet, which in turn connects or disconnects another circuit. Relays can be of different types like electromechanical, solid state. Electromechanical relays are frequently used. Let us see the internal parts of this relay before knowing about it working. Although many different types of relay were present, their working is same. Every electromechanical relay consists of an consists of an Elect...